CHS2 at Nigeria—From Power Outages to Energy Independence

2(1)

 

Maastricht-West, NetherlandsMaastricht-West, NetherlandsMaastricht-West, NetherlandsMaastricht-West, NetherlandsMaastricht-West, NetherlandsMaastricht-West, NetherlandsMaastricht-West, NetherlandsMaastricht-West, Netherlands Port Harcourt, Nigeira       Hotel       50kW/100kWh CHS2 All One Hybrid ESS

 

Project Background

Before CHS2, frequent grid outages disrupted operations and led to rising diesel costs. Now, CHS2 ensures a seamless power supply, charging from the grid and discharging during outages, while managing the diesel generator only when necessary.

 

Project Benefits

With this setup, the hotel is able to:

Uninterrupted power that keeps the hotel running seamlessly

Lower fuel costs & generator runtime

Cleaner, quieter, and more reliable energy

 Why CHS2?

  • Higher efficiency with DC coupling
  • 6 MPPTs and 200% PV oversizing 
  • Built-in STS with 20ms grid switching
  • AFCI & fire safety system
  • Plug & play installation with AI diagnostics